DraftVano / Buyer information
DraftVano Build Validation | What Is Proven & What to Check
A drawing matching its cut list is essential. It does not prove that a real build is safe, strong or easy to assemble.
What the digital checks cover
- The same individual member IDs and lengths drive the cut list, board maps, model and drawing projections.
- Stock packing includes the selected board length and saw kerf; unsupported splices and invalid configurations are guarded.
- Generated PDF text and page layouts are checked against the member schedule, with real sample excerpts available before purchase.
These checks address calculation and document consistency. They do not measure actual timber, cut accuracy, fastening strength, assembly access, print quality on your printer or site tolerances.
Practical review sequence
- Freeze the exact configuration. Record project, W × H × D, units, actual timber section, stock length, kerf, relevant opening and PDF revision. Keep the original PDF.
- Print and inspect. Print one drawing, one cut-list page and a board map at normal size in monochrome. Check member IDs, numbers, line contrast and margins. Do not scale a dimension off the picture.
- Measure actual materials. Check thickness, width, usable board length, end damage, straightness and moisture condition. A nominal “2×4” or “8ft” label is not a measured material specification.
- Trace a member end to end. Choose a repeated stud, rail and longest member. Match each ID and length between the list, map and all projections; include kerf/end allowances.
- Dry-fit a representative joint first. Check fastener reach, pilot holes, edge distances, splitting, squareness and assembly order with a competent reviewer before committing the full material purchase.
- Check the actual opening and site. Measure minimum clear space at more than one point. Include cladding, uneven walls, trim, fixings and service access. Verify manufacturer clearances independently.
- Record deviations. Keep dated photos, actual measurements, a change log and who performed the check. A failed check stays a failed check until corrected and rechecked.
Project-specific review
| Project | Additional practical checks |
|---|---|
| Media wall | Actual TV/fireplace installation openings, ventilation, heat separation, access, wall anchorage and electrical work. |
| Storage-bin rack | Actual tote body/lid/rim geometry, insertion/removal path, rail bearing, lateral restraint and anchorage. No untested load rating. |
| Workbench | Racking, top/subframe connection, fixing access, floor level and any intended machine loads. A saw or castor fit is not implied. |
| Bookcase | Shelf support and span, anti-tip restraint, wall fixings, face/cladding thickness and service access. |
| Outdoor kitchen | Grill manufacturer's non-combustible enclosure/clearance requirements, heat protection, utilities, weathering and countertop support. A timber-frame illustration does not authorize a grill installation. |
| Sauna | Heater and ventilation design, hot-surface clearances, electrical work, moisture detailing, bench support and local requirements. Room-volume guidance is not an approved heater specification. |
Printable review record
Use the fields below as a paper record. Leave unchecked items open; do not treat a form as certification.
Project / PDF revision: __________________________________________
W × H × D / units: ______________________________________________
Actual timber / stock / kerf: _____________________________________
Checked member IDs and measured lengths: __________________________
Joint / fixing / opening / clearance findings: ________________________
Corrections and recheck result: ____________________________________
Reviewer / relevant competence / date: _____________________________
☐ Printed pages readable ☐ Material measured ☐ IDs traced ☐ Dry-fit checked ☐ Site/manufacturer requirements reviewed ☐ Deviations resolved
Found a mismatch?
Stop the build and report the relevant member ID, page and measurement. We do not ask you to accept a suspected drawing error to continue. Genuine completed-build evidence can be added only after it exists and its scope is clear.